Facilities

PT Swarnadwipa Dermaga Jaya (SDJ) is equipped with high-capacity unloading facilities, SDJ’s port is linked to a 400,000-ton stockpile and has a crushing capacity of 12 million tons per annum (MTPA), using 1,500 tons per hour (tph) conveyor belts.

Jetty Facilities

The port includes three jetty units designed for loading coal onto barges:

  • Jetty 1: Designed with a capacity of 2×2,500 tons per hour.
  • Jetty 2: Designed with a capacity of 1×1,500 tons per hour.
  • Jetty 3: Designed with a capacity of 2×1,500 tons per hour.

Barge Loading Capacity

Currently, the average loading capacity of the jetties is:

  • Jetty 1: Six barges per day.
  • Jetty 2: Two barges per day.
  • Jetty 3: Three barges per day.