Jetty Facilities

Port

The port includes three jetty units designed for loading coal onto barges:

  • Jetty 1: Designed with a capacity of 2×2,500 tons per hour.
  • Jetty 2: Designed with a capacity of 1×1,500 tons per hour.
  • Jetty 3: Designed with a capacity of 2×1,500 tons per hour.