The port includes three jetty units designed for loading coal onto barges:
- Jetty 1: Designed with a capacity of 2×2,500 tons per hour.
- Jetty 2: Designed with a capacity of 1×1,500 tons per hour.
- Jetty 3: Designed with a capacity of 2×1,500 tons per hour.